Project: I-CAVS   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:paolo cavosi   -  
Project:   Vans - RV-10
Total Hours:2429.2
Total Flight Time:
Start/Last Date:May 28, 2019 - No Finish Date
Engine:IO-540 Thunderbolt Serial # EL-38135-48E
Propeller:MT Propeller MTV-12-B/193-53 serial 22G1268-K
Panel:Garmin G3X
 
Friendly URL: https://eaabuilderslog.org?s=I-CAVS

Home or Last Project Picture

Jun 04, 2020     10-19 TAILCONE step 2-7 - (2 hours)       Category: Fuselage
Assembled the F-1010 Bulkhead. Started putting all the manufactured heads on the same side, however i remembered the recommendation to put the manufactured head always on the thinner aluminum sheet, therefore i drilled out 6 rivets on the F-1011C-R and reverted the rivets in order to make sure the manufactured head is placed on the thinner side. Aesthetically it doesn't look pretty, but if these are the recommendations, i follow them.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.